Upscale shopping center approved in January 2011 after a court appeal. Developers Weingarten and Interface walked away before buying land; Adams's lender foreclosed in 2012.
Former Schrader Bellows / Parker Hannifin plant · DEQ ID NCD002591014 · Brownfields 07029-03-092
They knew.
For four decades, the ground beneath 12415 Capital Blvd has been saturated with some of the most dangerous industrial solvents known — trichloroethylene, tetrachloroethylene, compounds linked to cancer, kidney failure, and neurological damage. The chemicals seeped into the soil. They dissolved into the groundwater. And they kept moving.
The company knew. The regulators knew. The town of Wake Forest knew.
In fact, the town didn't just know — the town owned it. The Industrial Development Corporation, created by Wake Forest commissioners, held this property for decades. Contamination was documented as far back as the 1980s. And yet in 2006 — with a known toxic plume already mapped beneath the site — the IDC sold the land to a private developer for $2.9 million, pocketing $2.2 million for the town's own Futures Fund.
A futures fund. Built on poisoned ground.
Now, nearly twenty years later, another developer is cashing in — this time for a reported Costco, thousands of daily visitors, and construction workers breaking ground over an active contamination zone. No full cleanup required. No federal Superfund designation. No public hearing that put the contamination record front and center.
Just a brownfield agreement, a developer's check, and a vote.
This is not a conspiracy theory. This is the documented record.
The reports are public. The chemical readings are real. The plume is mapped. And the question that nobody in a position of power seems willing to answer is simple:
If this site were in their neighborhood — would they have voted the same way?
But this isn't just about paperwork and plume maps.
These are real neighborhoods. Real families. Real people who lived and worked within blocks of this site for decades — breathing the air, drinking from wells, raising children on streets that sit directly above contaminated groundwater. TCE doesn't stay buried. It volatilizes. It moves. And the cancers it causes don't announce themselves with a warning label.
We don't yet have a full accounting of how many people in this community have been diagnosed with kidney cancer, non-Hodgkin's lymphoma, or the other diseases linked to long-term TCE exposure. That accounting has never been done. Nobody ordered it. Nobody paid for it. Nobody cares.
Your neighbor's diagnosis may not be a coincidence. It may be a consequence.
And then there's Costco.
It's easy to see the appeal. The land is available, already zoned commercial, and sits on a major corridor in a fast-growing suburb. It has sat undeveloped for more than twenty years. From a real estate standpoint, it's a good deal.
Contaminated land like this typically sells at a discount — buyers price in the stigma and the restrictions that come with it, including, here, a ban on housing. This site's recorded sales bear that out: about $95,000 an acre in 2006, and as low as $53,000 an acre at the 2012 foreclosure auction. By comparison, Costco's own recent land purchase in Indian Land, SC ran about $228,600 an acre, and other commercial parcels on this same stretch of Capital Blvd have listed well above $100,000 an acre.
Here, the discount comes without the usual tradeoff. Land this cheap is normally cheap because whoever buys it inherits the cleanup bill. Not here: under the 2006 agreement, Parker Hannifin pays for remediation, and the developer "shall not be required to conduct active remediation." The buyer gets the discount. The neighbors keep the risk. We don't yet know what the current buyer is paying — no deed to Goodwinco has been recorded — but when it is, the price will be public.
For a retailer, it's a business decision. For the people of Wake Forest, it's something else entirely.
The contract on public record is with a developer, Goodwinco Acquisitions, not with Costco, and Costco typically doesn't discuss new stores until shortly before construction. We have not found any public statement about the contamination from Costco or the developer. No commitment on vapor testing. No commitment on worker protection. No word on how the fuel center's tanks will be kept out of contaminated groundwater. That is exactly why these questions need to be asked now — before the deal closes, not after.
Now consider who actually pays the price:
The construction workers who will break ground, excavate, and disturb decades of settled contamination — stirring up TCE-laden soil, releasing vapors, working in trenches cut through an active plume. OSHA limits exist. Site controls may be required. But controls are only as good as the oversight enforcing them, and nobody is watching the way they should be.
The employees who will clock in every day, park in that lot, breathe the air above that slab, spend eight hours in a building built over contaminated ground. Many will be young. Some will be pregnant. Unless someone tells them, few will know the full history of what's beneath their feet.
The customers — your neighbors, your parents, your kids — who will fill those aisles every weekend, loading up on bulk groceries and household goods, completely unaware that the warehouse they're shopping in sits on one of North Carolina's documented contamination sites.
The science of vapor intrusion — TCE rising through soil and concrete into the air inside buildings — is not speculative. It is documented. It is studied. And it is exactly why federal guidelines exist for buildings constructed over contaminated sites.
The deal goes to the developer. The risk stays with the community.
That's not a partnership. Building first and settling the cleanup later puts the risk on the people with the least say: the neighbors on private wells, the workers, and the shoppers.
A company like Costco has leverage that residents don't. It can make a full cleanup a condition of coming here. That's what we're asking it to do.
This record compiles the state's own files, recorded deeds and the Town's published history of the 30.5-acre plant on Wake Union Church Road at Capital Boulevard. It covers what is in the soil and groundwater, where it is spreading, what the Town of Wake Forest knew and when, and what is planned for the land now. Each claim links to the document it comes from.
Records current through November 9, 2026. Compiled from public records for residents; not legal or medical advice. See method and limits.
02 · Orientation
03 · Background
When Wake Forest College left for Winston-Salem in 1956, the town lost its economic center. In 1964 town commissioners created the Industrial Development Corporation (IDC), a non-profit they controlled, to sell bonds, buy part of the Jenkins farm, build a factory and lease it to Scovill Manufacturing Company — doing business as Schrader, a maker of air-control products — under a lease recorded the same day as $1,750,000 in IDC bonds. That lease made the tenant, not the Town's corporation, responsible for the condition of the land: it required Scovill (and later Parker Hannifin, as its successor) to indemnify the IDC against "any condition of the Leased Premises" and to comply with all law "irrespective of the cost thereof," foreseen or not. The lease never uses the words "environmental," "hazardous," or "pollution" — it predates federal hazardous-waste law by over a decade — so this was not written as an environmental clause; it was a generic indemnity that later proved broad enough to be read that way, and the 2006 termination agreement expressly kept it alive by name when the lease ended.
The plant, later run by Scovill as the Schrader Bellows plant and then by Parker Hannifin, treated plating wastewater through two unlined sand filter beds from 1964 to 1986 and cleaned machined parts with the solvent trichloroethene (TCE). A 1985 Consent Order with the State closed the beds and required monitoring wells; those wells found TCE in the groundwater. In 1987 the IDC itself recorded a hazardous-waste declaration pinpointing a disposal unit on "a portion of the Schrader-Bellows factory site" by its exact survey coordinates, a federal RCRA post-closure notice under 40 CFR 265.117(c).
The lease's original 20-year term ran out in 1984, but it auto-renewed annually, and the IDC's bonds were not actually paid off and released until December 1992 — eight years later than the Town's own Futures Fund page suggests. The IDC's 1964 Articles of Incorporation required it to transfer the property to the Town once the bonds were paid, but the IDC instead kept the land another 14 years. Most manufacturing stopped in December 2001. On June 2, 2006, the IDC ended Parker's ground lease — Parker signing as Scovill's "successor-in-interest," expressly preserving its indemnity obligations to the IDC — and sold the land the same day to developer Jim Adams's St. Ives 220 Commercial for $2.9 million (confirmed by the deed's own excise-tax stamp), the same day the Brownfields Agreement was recorded. The deed itself discloses, citing N.C.G.S. § 130A-310.8(b), that the property "has been used for management of a hazardous substance or waste disposal site." The proceeds, about $2.2 million after fees and claims, became the Town's Futures Fund.
Upscale shopping center approved in January 2011 after a court appeal. Developers Weingarten and Interface walked away before buying land; Adams's lender foreclosed in 2012.
63,000 sq ft store on 7 acres. DEQ approved the environmental plan in July 2017. Never built.
300 apartments and about 90 townhomes next to the plant. Rejected twice by the Planning Board; withdrawn in 2019, two months after DEQ's warning letters.
193,000 sq ft commercial, 300 apartments, 89 townhomes approved in July 2022. As of July 2026, none of the homes were built; the apartment site was halted by a stop-work order in 2025.
Reported in September 2024; Goodwinco memorandum recorded December 2025; DEQ-approved sampling for a new building and a fuel center, October 2026.
The records do not show cleanup costs killing these projects. Under the 2006 agreement Parker, not the landowner, pays for cleanup, and the developer "shall not be required to conduct active remediation." That allocation did not start in 2006 — it traces back to the 1964 lease's indemnity clause, which the 2006 termination expressly kept alive. The documented causes are the 2008–2012 recession and foreclosure, planning-board rejections, and DEQ's 2019 warnings about off-site contamination.
04 · Timeline
05 · Data
Parker's June–July 2025 sampling found eight volatile organic compounds above the permit's groundwater standards. TCE exceeded the 3 µg/L standard in 44 wells, peaking at 19,100 µg/L in recovery well RW-4, with 15,400 µg/L at MW-4 and 10,800 µg/L at PMW-2D. Vinyl chloride, which forms as TCE breaks down, exceeded its 0.03 µg/L standard in 20 wells, up to 2,900 µg/L.
Source: 2025 Annual Groundwater Monitoring Report, Section 3.2
| Compound | Highest (µg/L) | Standard (µg/L) | Times over | Wells over |
|---|
| Medium | Compound | Location | Highest | Standard |
|---|---|---|---|---|
| Groundwater | TCE | POC wells, July 2003 | 5,300 µg/L | 2.8 µg/L |
| Groundwater | cis-1,2-DCE | MW-6, July 2003 | 770 µg/L | 70 µg/L |
| Soil | TCE | SWMU-31 drum storage, Oct 2002 | 160 mg/kg | 0.053 mg/kg |
| Soil | Chromium | Sample 35-20a, June 2002 | 143 mg/kg | 30 mg/kg |
| Soil | Arsenic | Sample 35-20a, June 2002 | 4.71 mg/kg | 4.4 mg/kg |
Source: Brownfields Agreement, paragraph 7 . The 2003 and 2025 peaks come from different wells and are not a like-for-like trend.
"Generally decreasing" does not hold everywhere. The same 2025 report records PCE at well MW-5 at 71.2 µg/L, which it calls a historic high for that compound since sampling began. TCE in the deep bedrock well MW-6DR3 reached 949 µg/L and "show[s] an increasing trend between 2018 and 2025." Source-area well MW-3 and mid-gradient well MW-6 have both climbed back to about the levels seen before the 2014 pilot injection, and compliance well POC-2B rebounded through 2023 and 2024 to near its pre-injection values before falling again. Vinyl chloride, which only forms as TCE breaks down, reached 2,900 µg/L at a compliance well.
06 · Migration
The plume above 100 µg/L is about 1,100 by 325 feet, oriented north–south. Above the 3 µg/L standard it extends "to the north underlying off-site areas." DEQ's 2018 fact sheet says contaminated groundwater "has migrated north and discharges into Horse Creek."
TCE above standards was reported about 1,000 feet southwest of the boundary, on the Kearney Road apartment parcel, and about 100 feet west. DEQ said the plume "has not been fully delineated in the southwest direction" and that Parker must show the off-site TCE is not from its site. The apartment developer's plan calls the source "unknown" and names an active dry cleaner (enrolled in NCDEQ's DSCA program) as another possibility.
TCE above the standard extends "towards the southern boundary of the Site." In April 2026 DEQ rejected Parker's reasons for discarding soil-gas data near the self-storage property and required more sampling, noting that parcel has no land-use restrictions.
Well MW-36 sits here, on the southern boundary, in the area now mapped for the fuel center. Until 2019 its TCE readings ran from non-detect to around the laboratory's reporting limit. On August 28, 2019 it came back at 1,830 µg/L, 610 times the standard, and a confirmation sample a month later was the same order of magnitude. Parker sampled monthly for six months, watched it fall from 699 µg/L in November 2019 to 18.7 µg/L in April 2020, and concluded that the elevated readings "were a temporary condition", possibly a shift in flow after its 2017 injections. It then went higher: 2,260 µg/L in August 2021 (3,770 in the duplicate sample), the highest ever recorded there, before falling to 9.89 µg/L in June 2025 — the lowest since the spike began. Whatever moves TCE through this corner of the site, it has not stopped, and it is not steady.
Parker's own August 2026 parcel table records that the plume is not delineated "to the southwest, southeast, and south" of the plant land, and that it "[i]ncludes impacts beneath US HWY 1" — Capital Boulevard itself. In October 2025 DEQ sent two letters marked "urgent" to owners on the far side of Capital Boulevard, asking them to reconsider granting access for a monitoring well after Parker's consultant had tried repeatedly and failed. DEQ described the contaminated groundwater as having "originated from the Site's property", and warned each owner that refusing access could leave them "responsible for the assessment and cleanup" of whatever has migrated onto their land.
The records show a pathway to Falls Lake and past exceedances in a tributary. They do not show TCE measured in Falls Lake itself. Parker's plan proposes new samples at Horse Creek locations SW-18 and SW-23.
SW-12 is the downstream sampling point on the plant land, where the tributary leaves the property. Parker's August 2026 plan reprints every result ever collected there. The last round was taken on August 28, 2018, nine months after the pump-and-treat system was switched off. TCE came back at eight times the water-supply standard, and vinyl chloride — which had not been detected at that point in 2006 or 2007 — at 355 times its own. Nobody has sampled it since.
| Sampled | TCE | Vinyl chloride |
|---|---|---|
| Water-supply standard | 2.5 | 0.025 |
| Feb 17, 2006 | 1,500 | not detected |
| Feb 23, 2007 | 580 | not detected |
| Mar 1, 2010 | 177 | not detected |
| Aug 26, 2013 | 5.4 | 4.3 |
| Feb 26, 2014 | 180 | 17 |
| Mar 19, 2015 | 180 | 5.3 |
| Feb 9, 2017 | 7.3 | not detected |
| Aug 28, 2018 | 20.1 | 8.88 |
Source: CMS Work Plan Addendum, Appendix D-2, historical surface-water results . Standards shown are the NCAC 2B freshwater water-supply criteria the same plan proposes as the cleanup standards. Tributary B, at SW-14, was clean from 2006 through 2013, then showed TCE of 7.3 and 18 µg/L in 2014 and 13.3 µg/L in February 2017, and has not been sampled since. Only six of the 24 surface-water locations previously sampled were included in that final 2018 round, and the laboratory's reporting limits for vinyl chloride were themselves above the standard — so a "non-detect" in this table cannot show compliance.
The redevelopment would pipe the on-site drainage toward the homes. In the same passage that flags the surface-water data gap, Parker's plan describes what the current grading plans intend: "encapsulation of the wet-weather ditches in a series of buried stormwater pipes that will daylight at the northern Site property boundary." North is the direction of the houses and of Tributary A, and the direction the plume already runs. In a separate study Parker also notes that underground piping and its backfilled excavation trenches "can act as a preferential pathway for soil vapor" — a point it makes about the sewer line, not about the proposed stormwater pipes. Reading the two together is this site's inference, not Parker's claim.
07 · Accountability
The IDC was created by town commissioners in 1964 and dissolved by them after giving the sale proceeds to the Town. It owned the land for the plant's entire operating life and through every phase of the contamination's discovery. These are the documented points where the Town or its corporation was on notice.
"Hazardous Waste Restrictions and Declaration and Notice by the Industrial Development Corporation of the Town of Wake Forest," Book 4143, Page 467, signed by IDC President John E. Wooten, Jr. It names "a portion of the Schrader-Bellows factory site" by exact survey coordinates and cites the federal post-closure rule for hazardous-waste disposal units.
DocumentedCentral Carolina Bank released the 1964 bond mortgage in December 1992, confirming the IDC's $1.75 million bond issue was "paid in full and cancelled." Under Article FOURTH of the IDC's own 1964 Articles of Incorporation, full repayment was the trigger for transferring the property to the Town "without consideration of whatsoever kind or nature." No such transfer is recorded; the IDC kept the land another 14 years.
DocumentedOn April 15, 2004 the Notice of Intent, with the draft Brownfields Agreement, was hand-delivered to Town Manager Mark Williams for 60 days of public review. Its enclosed description names the IDC as owner, describes TCE in groundwater and a plume whose extent "has not been completely defined," reaching bedrock 113 feet down and beyond the north and west boundaries, and TCE in an off-site drainage swale.
On June 2, 2006 the IDC terminated Parker's lease — preserving Parker's indemnity obligations by name — and deeded the land to St. Ives 220; the Brownfields Agreement and plat were recorded the same day. The deed itself discloses the hazardous-waste history, citing N.C.G.S. § 130A-310.8(b) and pointing back to the 1987 declaration. The agreement names the IDC as owner, but only DENR and the buyer signed it.
DocumentedOn February 18, 2016 DEQ mailed the Town Clerk a copy of Parker's hazardous-waste permit renewal application, noting it is "required by GS 130A 294(f) to submit a copy of the permit renewal application to the city and county governments in the location of the hazardous waste management facility." The clerk addressed was Deeda Harris — copied again on DEQ's warning letter three years later.
DocumentedDEQ held the hearing on the draft renewal permit at the Northeast Regional Library at 10:30 on a Wednesday morning. Two staff attended and waited half an hour. The memo to file records that "no interested public arrived to attend between 10:30 am and 11:00 am." This is the only public hearing in the record on the permit that governs this cleanup, and the permit it produced runs to 2028.
DocumentedOn November 13, 2024 the Town executed a Stormwater Control Facilities Operation and Maintenance Agreement with the VCP entities, for a wet detention pond on the apartment land. The filing itself is routine and has nothing to do with contamination. What had changed by then is the context: the developer's own September 2024 sampling had already found TCE above the standard on that parcel, and DEQ had named the same land to three Town staff in 2019 and to the Town Manager in 2023.
Replying to a resident on Facebook on November 4, 2026, Commissioner Adam Wright wrote: "The contamination isn't a secret. It's been documented and regulated for decades, and we've been aware of the brownfield status as redevelopment has been discussed."
Documented08 · Remedy
Parker pumped and treated groundwater from 1992 and ran soil vapor extraction from 1996, excavated oily soil in 1999 and again in a project completed in 2024, and injected materials that help bacteria break down TCE (pilot 2014, full scale 2017, most recently October 2025 to March 2026). The consultant reports TCE "generally decreasing over time," with rebounds after each round. Yet DEQ wrote in May 2025 that "there is no final remedy for the facility."
The groundwater treatment system came on line in May 1992 and ran until November 27, 2017. It was switched off the day before full-scale biological injections began, to stop the pumps drawing out the injected carbon substrate, and it has stayed off ever since — through 2025, and through the two most recent DEQ compliance inspections, which record the equipment sitting inside a locked trailer and note that it "has not been operating since November 2017." The soil vapor extraction system is likewise described in Parker's 2026 plan as a former system.
That date matters beyond the site. The last federal finding that contaminated groundwater here was "under control" was made in September 2015, when the pumps were still running, and no new determination has been recorded since. See the federal records.
What twenty-four years of pumping took out. Parker's own plan gives the total: as of August 2016 the treatment system had pumped and treated about 64.3 million gallons of groundwater and removed 4,231 pounds of TCE. For scale, the plant's own federal filings reported releasing about 98,400 pounds of TCE to the air in the four years from 1988 to 1991 — some twenty-three times as much, in a sixth of the time. The two figures measure different things: solvent vented while the plant ran, against solvent pulled back out of groundwater afterwards. They are not a balance sheet, and nothing here says the air releases became the plume. They are offered only as a sense of scale.
In September 2018, as the first phase of redevelopment was being prepared, DEQ wrote to Parker asking for a plan covering the whole site rather than the piece in front of it: "we would like to see a complete remediation plan for the site. It is not prudent, for the developer, or Parker, or the state to work the site piecemeal in anticipation of the next phase of construction."
Fifteen months later DEQ was more direct. Reviewing Parker's interim work plan for two waste units and the northeast building area, it found the plan "inadequate as it only deals with partial, interim soil measures for selected areas of the Site", and required a comprehensive Corrective Action Plan addressing all soil, groundwater and vapor-intrusion issues, on site and off site, by February 7, 2020.
Parker asked for an extension three weeks later, offering to file 90 days after DEQ agreed the investigations were finished and giving a submittal date "currently to be determined." DEQ granted it in January 2020, called the request reasonable, set no replacement deadline, and asked to be updated monthly. No comprehensive Corrective Action Plan appears anywhere in the records gathered for this site. The August 2026 addendum below is a study work plan, not a remedy, and it still describes a full risk-based demonstration as "not practical and not proposed at this time."
"The RCRA Part B permit also requires Parker to remediate the TCE plume until concentrations … from the four Point of Compliance wells do not exceed the North Carolina groundwater standards."
Redevelopment is the stated reason for moving the yardstick. The addendum's own justification for relocating the four point-of-compliance wells is that they "are in locations that will undergo major land disturbance and infrastructure development under the current Site redevelopment plans", and that moving them to the property boundaries would "avoid future efforts to maintain and continue using" them where they stand. In its cover letter Parker asks DEQ for expedited approval so that soil sampling can be finished "before property redevelopment activities by others, which will involve heavy equipment and soil disturbance." The northeast corner of the plant land, the addendum notes, "has recently undergone land disturbance" for a paved access road and roundabout for that redevelopment.
Contaminated soil is meant to stay, and Parker wants the bar moved. The 2023 excavation did not finish the job: Parker's plan records that soils exceeding the protection-of-groundwater levels "were not fully addressed during the excavation process," and that a June 2025 evaluation concluded metals and VOCs above those levels "remain in on-Site soils." The addendum then proposes site-specific leaching tests which "may demonstrate that the NCDEQ default PoG PSRGs are overly conservative" — that is, that the State's standard is stricter than this site needs. The purpose is set out plainly: to develop alternate cleanup concentrations for "which soils can remain at the Site and be used as beneficial fill during Brownfields Property redevelopment." Soil that stays on site as fill under a new building is soil that is never hauled away.
The addendum says Parker's long-term strategy is a risk-based cleanup under N.C.G.S. 130A-310.65 to 310.77, though a full technical demonstration "is not practical and not proposed at this time." It proposes sampling site soils first, "before Site property redevelopment begins," with groundwater, surface water and soil gas sampled later "at currently undefined dates" because of property-access problems. The draft CMS Report is due 120 days after that sampling and then goes to public comment before DEQ selects a final remedy.
2006 figure as reported by the Wake Forest Gazette ; the 2018 estimate is the figure Parker itself cited in April 2019 ; 2025 and 2026 approved estimates from DEQ . The 2026 cut reflects $1,336,900 of completed treatment removed from the estimate.
In 2019 Parker asked to take most of the cash back. On April 11, 2019 Parker's vice-president for environment, health and safety wrote to the head of DEQ's Hazardous Waste Section. Against a 2018 post-closure and corrective-action cost estimate of $2,821,944, Parker said its total financial assurance was "in excess of $6.4 million", and asked DEQ's permission to reduce the cash in its KeyBank cleanup trust so that $150,000 remained, with the difference refunded directly to the company. A $2,826,018 surety bond from Travelers would stay in place as the assurance. Financial assurance has to match the approved estimate, and that estimate has since been cut again, to $1,916,423 in June 2026.
09 · Legal framework
A brownfields agreement lets a buyer who did not cause contamination redevelop the land with protection from cleanup liability, in exchange for recorded restrictions that run with the land. This one was signed by DENR's Linda Culpepper and St. Ives 220's James M. Adams Sr., and recorded at Book 11991, Pages 2634–2666. Parker remains responsible for the cleanup under its separate hazardous-waste permit. The developer "shall not be required to conduct active remediation."
Certifications are missing for 2010, 2015, 2016, 2018 (later covered), 2023 and 2025, and the State sent notices in 2011, 2014, 2015 and 2023. None of the filed forms reports a violation.
10 · Now
In September 2024 local news, citing the Triangle Business Journal, reported Costco was eyeing land near the US 1 / NC 98 interchange. On December 1, 2025 a memorandum between owner VCP Wake Union and Goodwinco Acquisitions was recorded; the "Goodwinco" name appears to trace to GoodwinCo, a Raleigh, NC retail/mixed-use developer founded by Abbitt Goodwin — not, as this site previously stated, "The Goodwin Companies" (an unrelated Dunn, NC truck-body manufacturer). North Carolina's Secretary of State business registry could not be queried automatically to confirm the exact entity, so this identification should be treated as probable, not certain. A memorandum puts a contract on record; it is not a sale, and no deed to Goodwinco had been recorded as of early November 2026. Residents report an informal neighborhood meeting about a Costco on the plant land.
On October 8, 2026 DEQ approved Terracon's sampling plan for a "Proposed New Building" and a "Proposed Fuel Center" on the plant land, with about 30 geotechnical borings and soil and groundwater sampling at the gas-station location, drawn over the mapped VOC and metals soil areas. On the approved map the fuel center sits in the southern corner of the plant land — the area around well MW-36, where TCE peaked at 2,260 µg/L in August 2021, and the same southern edge where the disputed soil-gas results were collected. The building runs along the west side, the side nearest the houses. The map is titled "Proposed Development – Wake Forest, NC CW #23-0158"; reading "CW" as Costco Wholesale is an inference this site draws, not something the document says.
The sale is on a long fuse. The recorded memorandum gives a contract date of November 18, 2025 and an outside closing date of January 12, 2028. Parker's post-closure permit runs out in 2028 as well, which means the permit renewal and the closing may land in the same year. DEQ's own inspection reports give the expiry date as July 9, 2028 (2024) and June 8, 2028 (2026).
Monitoring wells are already being pulled for the redevelopment. In December 2025 DEQ approved decommissioning fourteen of them — MW-1, 2, 7, 9, 10, 12, 14, 16, 18, 18d, 22, 25, 26 and 41 — because redevelopment would disturb them or Parker had judged them unnecessary. It refused two: MW-20 and MW-27, "due to the importance of these wells for off-site plume delineation purposes", and recommended reinstalling them on the townhome parcel. Parker's 2025 monitoring report, however, says sixteen wells were requested and that all but MW-26 were abandoned in February 2026 — arithmetic that only works if the two wells DEQ refused to release were removed anyway. Which happened is a question for DEQ.
A warehouse store is a commercial use and fits restriction (a). Construction must follow restrictions (c), (d) and (f): sampling before exposing soil or groundwater, DEQ approval, and a building designed against vapor intrusion.
11 · Next door — The Apartment Story
Directly west of the Parker Hannifin plant, on Kearney Road, a 300-unit apartment complex is under construction. The developer is VCP Wake Forest LLC. The contamination beneath the site comes from the same toxic plume — TCE migrating west from the former factory next door.
What happened here is a preview of what could happen with Costco. And it should alarm every future resident who signs a lease — and every Wake Forest commissioner who approved it.
VCP's own sampling finds TCE up to 36.5 µg/L in groundwater beneath the apartment parcel. The state standard is 3 µg/L. That is more than twelve times the legal limit — the same chemical, the same plume, migrating from the Parker plant next door.
Synovus Bank commissions a Phase I Environmental Site Assessment before closing its loan. The report finds no recognized environmental conditions on the parcel — one month after VCP's own sampling documented TCE at twelve times the standard. The loan closes. Construction money flows.
A bank-hired consultant said the land was clean. The developer's own files said otherwise. Nobody told the future tenants.
Clearing and mass grading begin before the site has even entered the state brownfields program. Soil-gas TCE was 16–700 µg/m³ in late January 2025, before the May 13, 2025 stop-work order; a sample taken after the stop, on June 24, 2025, in the southern portion along Wake Union Church Road, measured 3,700 µg/m³. That area is not the edge closest to the Parker plant — Parker lies to the east, by the northeast corner.
Workers were digging through contaminated ground. No brownfields agreement was in place. No vapor controls had been designed. Construction proceeded anyway.
On May 13, 2025, DEQ's Inactive Hazardous Sites Branch sends VCP Wake Forest a formal Notice of Regulatory Requirements. Soil-gas samples on the parcel exceed acceptable levels for residential use, and the State writes that the developer is "advised not to proceed with further construction activities until the extent of contamination is defined and a plan for mitigation has been approved." The notice is copied to the Town of Wake Forest and the Wake County Manager.
The developer's consultant replies the same day. It had not sent the sampling results to the State earlier because "we simply were not aware it was required," and it hopes to address them "while still moving forward with development if possible."
Wake County issues a stop-work order. Construction halts. The developer's own Environmental Management Plan later confirms it plainly: "Development was halted due to a stop work order from Wake County due to environmental concerns."
The site sat idle for months. The contamination had been known for a year. The lender had been told there was nothing to worry about.
After reviewing the developer's soil-gas study, DEQ identifies two areas of higher solvent concentrations on the apartment land: one along Wake Union Church Road, the other in the northeast corner beside the Parker property. "The higher contaminant concentrations may indicate a source area," the State writes. It calls for soil and groundwater sampling in both spots, and says any soil contamination found above unrestricted-use cleanup goals should be removed "before any further construction activities."
The same letter says the vapor system must be part of an approved cleanup plan with land-use restrictions. Then it lays out the alternative: "If you choose to pursue and receive a Brownfields Agreement for this property … you will only be required to follow the requirements outlined in the Brownfields Agreement." The developer applies to the brownfields program the next month. Soil samples the developer's consultant took that October found no TCE or PCE, according to Parker's 2026 study.
On Parker's own October 2026 soil-gas map, the Wake Union Church Road hot spot is the largest area above the commercial screening level anywhere on the map. See the maps.
In October 2025, DEQ accepts the parcel into the brownfields program for high-density residential use. The Letter of Eligibility notes that "additional assessment will be necessary for DEQ to determine if vapor mitigation measures are needed."
A plan for 12 three-story apartment buildings is approved. Construction restarts July 6, 2026.
A second round of soil sampling covers the shallow grading areas and the northern stockpile. Arsenic turns up above the state's residential cleanup goal in every single sample — the developer's consultant says that reflects naturally occurring background levels, not contamination, and DEQ had already accepted a similar explanation for an earlier round of soil on July 13.
But DEQ does not accept this report's results for one class of chemicals: the volatile organic compounds that matter most given the site's TCE history. DEQ's own cover note is blunt: "BRS is unable to accept the VOC results as disturbed samples were sent to the laboratory for analysis. Additional undisturbed soil samples will be collected as part of final grade sampling and submitted for VOC analysis to confirm."
As of the most recent check of DEQ's own files (November 17, 2026), nothing shows that confirmatory testing was ever filed or accepted. Grading has continued in the meantime.
DEQ approves a vapor intrusion mitigation plan on October 13, 2026. Every building must have a sealed vapor barrier beneath the slab with passive venting — convertible to active fans if testing shows vapors rising. Indoor-air tests are required before anyone moves in, and twice yearly for two years after.
Read that again: before anyone can live there, the air inside each apartment must be tested for cancer-causing vapors rising from the ground.
As of the latest records, 300 apartments are planned for occupancy in summer 2027 — directly on the contaminated plume, next to a plant with no final cleanup plan, and without a signed brownfields agreement between the developer and the state.
Future tenants will not be told the full history. They will not see the Phase I report that said there was nothing wrong. They will not read the soil-gas numbers from 2025. They will sign a lease, move in furniture, put children to bed — above a sealed vapor barrier, installed because the air beneath the slab was too contaminated to leave alone.
The vapor barrier is not a cleanup. It is a lid. And if the passive venting fails, or the monitoring lapses, or the brownfields program's oversight is cut — the lid comes off.
12 · October 2026 — Parker's answer
In June 2026 DEQ told Parker it "must demonstrate that the off-site TCE groundwater contamination … is not from the Site." DEQ approved Parker's plan in July and set September 15, 2026 as the deadline for a first report. Parker's consultant, AECOM, delivered a desk study (a review of existing reports and maps, with no new sampling) dated October 15, 2026, a month after the deadline. No extension appears in DEQ's public file.
Most of what Parker says it cannot determine turns on one thing: it needs to drill on land it does not own. Its July 2026 work plan states that Parker "has requested property access from six separate property owners to the south … but has not received approval," with negotiations continuing with the self-storage owner, the Servo Ventures properties and — notably — the apartment developer, and with the NCDOT right of way along Capital Boulevard also being pursued.
Parker's April 2026 letter sets out what it had tried: phone calls to tenants and owners, visits to the properties, and access agreements sent by mail. The self-storage property is leased and its owner lives out of state; the storage company said it could not help. Agreements went to that owner and to the Clarion hotel owner on December 16, 2025, and, in Parker's words, "no response has been received." Parker asked DEQ to write its own request letter.
DEQ did. It wrote to two owners east of Capital Boulevard in October 2025, to the self-storage owner in May 2026 and to a second Wake Union Church Road owner that June, in each case stating that Parker is cleaning up groundwater that "originated from the Site's property" and warning the owner that refusing access may leave them responsible for the assessment and cleanup of whatever has migrated onto their land. The self-storage easement was finally recorded on October 30, 2026, five months after that letter and two weeks after the desktop study went in still describing access as pending.
The practical effect is that the question DEQ asked in June 2026 — prove the off-site TCE is not yours — cannot be answered from the ground until neighbors agree, and the people being asked to agree are being told, in the same letter, that saying no may make the problem theirs.
Each row is that party's own position as filed with the State, quoted rather than characterized. They cannot all be right. The only one of them with a legal obligation to settle the question is Parker, and the record above shows it asking six neighbors for permission to go and look.
These figures come from Parker's October 2026 study. Select a map to enlarge it.
13 · Next door
One 2025 groundwater sample above the TCE standard; soil vapor within limits. Parker's consultants recommend a groundwater-use notice. Named in DEQ's 2019 and 2023 letters.
Focus of DEQ's April 2026 soil-gas demand; no land-use restrictions. Parker and the owners recorded an Access and Use Agreement October 30, 2026, allowing sampling and wells; it ends on a No Further Action letter or DEQ's acceptance of Parker's conclusions on the source.
The 2022 "all clear" is narrower than it looks. DEQ called Parker's 2005 vapor study of this subdivision "outdated" in June 2019 and required a new one. In November 2021 Parker sampled four soil-gas points beside the homes, chosen because 2020 groundwater there held TCE of 4.15 to 16.6 µg/L: TCE came back above the 14 µg/m³ residential screening level at three of the four, and vinyl chloride above its level at two. The plan was then to sample up to four homes. Only two homeowners granted access, and it is those two 2022 results that came back below screening levels. Parker's August 2026 table still lists eleven existing houses on this street, built between about 2006 and 2023, plus two homeowners-association parcels, as candidates for groundwater-use notices or vapor assessment.
Proposed for groundwater-use and vapor restrictions; data gaps and past access problems noted.
An active dry cleaner at 12231 Capital Blvd, in the State's dry-cleaner cleanup program. The apartment developer and Parker both name it as another possible TCE source. Its own consultant says its TCE "appears to originate off-site from the north/northeast."
14 · Context
A separate site at 7303 Stony Hill Road, linked to a circuit-board operation, not Parker. State regulators learned of contamination in 2005; most neighbors learned in 2012, when EPA testing found about 21 affected family wells. EPA spent about $3.7 million; the responsible parties paid $500, per NC Newsline.
An Ohio EPA inspection reportedly found the groundwater treatment system shut down for two years, unreported TCE discharge exceedances, and no vapor testing of the stores above the plume.
Over a dozen hazardous-waste violations, including treating dangerous waste without a permit; five violations cited by the state in 2019 were still uncorrected.
EPA's 2018 proposed final remedy for TCE, PCE and 1,4-dioxane in groundwater: monitoring plus controls barring residential use and drinking water. The same manage-in-place model.
15 · Federal
The site is already under federal hazardous-waste law (RCRA), administered by North Carolina. EPA's long-standing policy is to defer listing a site on the National Priorities List when it "can be comparably addressed under RCRA Subtitle C Corrective Action," with exceptions that mainly cover owners unable or unwilling to pay. Because Parker holds the permit, has financial assurance in place and is doing the work, a Hazard Ranking System score of 28.5 or more would not by itself put the site on the list.
16 · Federal records
The plant appears in EPA's national systems under one Facility Registry ID, 110000700974. The registry links it to the hazardous-waste database RCRAInfo (as NCD002591014), the Toxics Release Inventory (as "Schrader Bellows"), and an air-program record now marked inactive. The figures below come from EPA's public Envirofacts data service and its ECHO compliance report, retrieved November 6, 2026. Copies of the raw records are in the document library in case the live data change.
Under the federal right-to-know law, the plant filed a Toxics Release Inventory report for trichloroethylene (TCE) every year from 1988 to 1992. Each report was signed by the plant manager and names Parker Hannifin Corp. as the parent company. Reported air releases rose from 18,635 pounds in 1988 to 31,030 pounds in 1990. Nearly all of it was "fugitive" emissions, meaning solvent vapor escaping from the building rather than leaving through a stack. The plant also shipped 18,871 pounds of TCE off site in 1988, to Southeastern Chemical & Solvent in Sumter, South Carolina. The 1992 report, the last one filed, listed 5 pounds of air releases.
| Year | Fugitive | Stack | Total |
|---|---|---|---|
| 1988 | 17,385 | 1,250 | 18,635 |
| 1989 | 28,860 | 940 | 29,800 |
| 1990 | 30,090 | 940 | 31,030 |
| 1991 | 18,000 | 940 | 18,940 |
| 1992 | 3 | 2 | 5 |
Source: EPA Toxics Release Inventory, Form R reports for facility 27587SCHRDUS1NO . TRI reporting began nationally with the 1987 reporting year, and the earliest report on file for this plant covers 1988, so there is no public release figure for the plant's first 24 years. These are the company's own estimates. On their own they say nothing about any person's exposure or health.
RCRAInfo tracks every hazardous-waste cleanup against the same national sequence of milestones, each with a code and a date. For this facility the investigation stage alone took nearly two decades. RCRAInfo logs 25 investigation work plans or revisions received between 1991 and 2018 and six formal notices of deficiency, the first two issued by EPA in 1993 and 1994. The investigation was then approved area by area between 2006 and 2009. The record has no entry for any of the steps that end the process: no Corrective Measures Study report, no remedy decision and no remedy construction. The newest entry, dated August 31, 2026, logs Parker's study addendum as "supplemental information."
Milestone names follow EPA's national event-code definitions . A dash means no such event is recorded for this facility as of November 6, 2026 .
Regulators also grade every cleanup site on two national "environmental indicators": whether current human exposures are under control, and whether contaminated groundwater has stopped spreading. In March 2012 the State recorded that human exposures here were not under control. DEQ's 2018 fact sheet tied that finding to trespassers' possible contact with contaminated soil and said Parker was installing a security fence. The finding changed to "under control" in September 2015. Groundwater migration was recorded as under control in March 2012 and again in September 2015.
EPA defines the groundwater finding as meaning that monitoring will confirm contaminated groundwater stays within its existing footprint. The finding is to be "re-evaluated when the Agency becomes aware of significant changes at the facility." Since 2015, DEQ has told Parker it is responsible for removing off-site impacts (2019). In June 2026 DEQ wrote that the plume is not delineated to the southwest, where TCE above standards turned up about 1,000 feet beyond the boundary. As of November 6, 2026, RCRAInfo shows no new groundwater determination.
One change since 2015 is not in the federal record at all. The September 2015 finding was made while the pump-and-treat system was running; it was switched off on November 27, 2017 and has not run since, as DEQ's own 2024 and 2026 inspections confirm. The finding has not been revisited.
ECHO shows "No Violation Identified" for every quarter from 2024 through 2026, and RCRAInfo records no violation since 2001. Of the 157 evaluations since 1986, the State did 149 and EPA did 8, and 94 were reviews of financial or other records rather than site inspections. The early record is less clean. Inspections by EPA and the State in 1987 and 1988 found violations of general hazardous-waste facility standards and land-disposal rules. A 1988 review of Parker's financial-assurance records led to a State compliance order under RCRA section 3008(a). Inspections in 1989 and 1990 found further violations, including of groundwater-monitoring rules, and a 2001 inspection found a violation of pre-shipment rules for waste. Each was marked resolved within months. No penalty amount appears in the record.
These checks measure whether Parker follows the rules of its permit: monitoring, reporting and financial assurance. They do not measure whether the contamination is gone. A facility can be in full compliance while its cleanup remains undecided, and that is what the federal record shows here.
EPA has also been directly involved. It inspected the plant from 1986 to 1988, completed the 1990 facility assessment, and appears with the State on the 1991 permit that imposed the investigation, which RCRAInfo records as a joint authority. EPA also reviewed Parker's financial records four times between 2007 and 2012. North Carolina now runs the program under EPA authorization.
In its 2001 biennial report, the plant listed 7,428 tons of groundwater pumped from its recovery wells. The water was classed as hazardous waste for trichloroethylene (federal code D040) and air-stripped on site to remove the solvent. The same report lists small amounts of treatment sludge shipped to landfills in North Carolina and Michigan. The 2005 report lists the "closed in place" unit SWMU 16, the former sand filter beds, under the federal codes for electroplating wastewater sludge and cyanide plating-bath residues (F006 and F008). RCRAInfo flags the facility as a whole for releases to groundwater, soil and surface water.
Source: ECHO Detailed Facility Report, community profile based on the 2024 American Community Survey 5-year summary, centered on the plant . ECHO notes that compliance data alone cannot show whether a facility affected public health.
17 · Transactions
2006 figure confirmed independently by the deed's own excise-tax stamp and by the Town's Futures Fund page ; the 2019 and 2022 sales are likewise confirmed by their own recorded deeds' excise-tax stamps . The 2012 figure is a newspaper estimate with no deed on file to confirm it. The 2006 sale covered the plant only; later sales include the adjoining tracts.
18 · Participation
Ask the Town Clerk for Board and IDC minutes, 2002–2006; IDC correspondence about the sale; and the 2006 deed. (The Jan. 2025 VCP–Town filing, Book 19818, Page 149, turned out to be a stormwater maintenance agreement, not a contamination record.) Public records requests go through the Town Clerk's office.
Ask NC DEQ for all correspondence with the IDC or the Town about this site, and the September 15, 2026 off-site investigation report. File through DEQ's public records portal.
Bring the documents on this site to the Planning Board and Board of Commissioners when the site plan comes forward, and ask the questions listed under the Costco proposal.
19 · Sources
Every state record cited here is hosted on this site. Very long reports are trimmed to the pages this site cites (their summary text and key figures or tables), marked "Excerpt" with the page range; the full report is one link away in the State's file system. Nothing within a hosted page is blacked out. News and federal pages are linked at their source.
20 · Terms
Every document and data file cited on this site — 142 cited sources, 114 of them hosted here, including full DEQ reports, EPA data exports, deeds, compliance letters, inspection reports and archived news articles — is available as a single zip archive.
Files are named to match the references above. Web pages are saved as plain text; EPA data as JSON; all other records as PDF.
⇩ Download evidence archive (543 MB) — coming soon
The archive is being prepared for hosting; the download link will be enabled once it is online.
About this site
I live with my family in a neighborhood near 12415 Capital Boulevard in Wake Forest, NC. We rely on well water. The contamination plume is currently a few hundred feet downstream from us — not in our well yet. But plumes move, and "not yet" is not the same as "safe."
I first learned about this site a few years after moving here, when I attended town hall meetings about a proposed development on the land. What I heard concerned me. What I found in the public record when I started digging concerned me even more.
I want to be clear about something: I am not anti-Costco. I was a loyal Costco member when my family lived in Virginia. We love the store, the products, the value it brings to a community. We would genuinely welcome one here in Wake Forest. The town could use it. But not on that land. Not while a TCE plume is still moving, still uncontained, still without a final cleanup remedy — 41 years after the state issued its first Consent Order.
I also want to be clear about who I am not. I don't represent any organization, advocacy group, or political interest. No one is funding this. This website was built on my own time, with my own money, with no institutional backing of any kind. I'm not looking for attention or credit. I'm a father who cares about his family, his neighbors, and the water his kids drink. That's the whole story.
My neighborhood uses well water. So do others nearby. The contamination plume has already migrated beyond the property boundary — roughly 1,000 feet to the southwest, per DEQ's June 2026 letter — and it's moving toward Falls Lake, the drinking water source for hundreds of thousands of people in the Triangle. No concrete slab stops groundwater.
I also think about the construction workers who will break ground on that site. The fuel center employees who will work outdoors there every day. And the families moving into the 300 apartments being built on the Kearney Road corridor — the same contaminated corridor — including their children.
These aren't abstractions. They're my neighbors.
Simple: a full, genuine cleanup — by Parker Hannifin, the company responsible, or by the EPA if Parker won't act. Not "risk-based" standards that move the goalposts. Not institutional controls that restrict land use in perpetuity and call it remediation. Actual cleanup of the contaminated soil and groundwater.
Once that is done, conversations about new construction would be welcome. Bring Costco. Bring economic development. Bring the tax revenue Wake Forest needs. Just clean it up first.
That's not a radical ask. It's the minimum standard any community should expect.
This site aggregates public records — DEQ files, brownfields filings, groundwater monitoring reports, recorded deeds, town correspondence — so that any resident can read the documented record for themselves without having to file a records request or know where to look. Everything here is sourced. Everything links to the original document.
I am not a lawyer, an engineer, or an environmental scientist. I am a neighbor who learned to read public records, and I am not going to stop until there are real answers and real accountability.
Revision history
This site is a living document. Every substantive update is logged here, newest first, with what changed and why. Click an entry to expand it.
All three bullets reuse citations already in the library; no new sources added.
The footer's revision number was bumped from 1.8 to 1.9 to mark the Tier 1 + Tier 2 content buildout (below) as the published revision. No content change.
Also corrected the stormwater-agreement timeline date and normalized curly quotes to straight quotes sitewide (149 marks, text only).
Also corrected the private-well count (35 parcels, not 19) and MW-36's peak concentration figure.
Project records show this revision number was already in place before the Tier 1 and Tier 2 buildouts (Rev. 1.7 and 1.8 below) began. No content change distinct from Rev. 1.5's cumulative state is documented separately.